Engineering Papers⌕ Search

Engineering topics

Anderson, Michael

Publications and source records attributed to Anderson, Michael.

Analysis on Evaluations of Monterey Bay Aquarium Research Institute’s Wave Energy Converter’s Field Data Using WEC-Sim and Gazebo: A Simulation Tool Comparison

Although many studies have validated wave energy converter (WEC) numerical models against scaled prototype experimental data, there remains a notable lack of validation using data from full-scale deployed WECs. This paper compares two numerical models of Monterey Bay Aquarium Research Institute’s Wave Energy Converter (MBARI-WEC), a two-body point absorber with an electro-hydraulic power take-off system (PTO). The models are implemented in WEC-Sim/Simscape and Gazebo Simulator. A statistical analysis of the models was performed, and field results were obtained to compare the models’ accuracy in predicting the RMS piston velocity, RMS motor speed, and mean electric power compared to field data for 56 observations across varying sea states. The Gazebo model demonstrated a closer agreement across all three parameters for a majority of the observations. When compared to the field data, the Gazebo and WEC-Sim models exhibited average mean electric power overestimations of 13% and 22%, respectively.

16 TIDAL AND WAVE POWER↗

Detecting Rain–Snow-Transition Elevations in Mountain Basins Using Wireless Sensor Networks

Here, to provide complementary information on the hydrologically important rain–snow-transition elevation in mountain basins, this study provides two estimation methods using ground measurements from basin-scale wireless sensor networks: one based on wet-bulb temperature T wet and the other based on snow-depth measurements of accumulation and ablation. With data from 17 spatially distributed clusters (178 nodes) from two networks, in the American and Feather River basins of California’s Sierra Nevada, we analyzed transition elevation during 76 storm events in 2014–18. A T wet threshold of 0.5°C best matched the transition elevation defined by snow depth. Transition elevations using T wet in upper elevations of the basins generally agreed with atmospheric snow level from radars located at lower elevations, while radar snow level was ~100 m higher due to snow-level lowering on windward mountainsides during orographic lifting. Diurnal patterns of the difference between transition elevation and radar snow level were observed in the American basin, related to diurnal ground-temperature variations. However, these patterns were not found in the Feather basin due to complex terrain and higher uncertainties in transition-elevation estimates. The American basin tends to exhibit 100-m-higher transition elevations than does the Feather basin, consistent with the Feather basin being about 1° latitude farther north. Transition elevation averaged 155 m higher in intense atmospheric river events than in other events; meanwhile, snow-level lowering was enhanced with a 90-m-larger difference between radar snow level and transition elevation. On-the-ground continuous observations from distributed sensor networks can complement radar data and provide important ground truth and spatially resolved information on transition elevations in mountain basins.

54 ENVIRONMENTAL SCIENCES↗

NASA Near Earth Network (NEN) Support for Lunar and L1/L2 CubeSats

The NASA Near Earth Network (NEN) consists of globally distributed tracking stations, including NASA, commercial, and partner ground stations, that are strategically located to maximize the coverage provided to a variety of orbital and suborbital missions, including those in LEO, GEO, HEO, lunar and L1/L2 orbits. The NENs future mission set includes and will continue to include CubeSat missions. The majority of the CubeSat missions destined to fly on EM-1, launching in late 2018, many in a lunar orbit, will communicate with ground based stations via X-band and will utilize the NASA Jet Propulsion Laboratory (JPL) developed IRIS radio. The NEN recognizes the important role CubeSats are beginning to play in carrying out NASAs mission and is therefore investigating the modifications needed to provide IRIS radio compatibility. With modification, the NEN could potentially expand support to the EM-1 lunar CubeSats.The NEN could begin providing significant coverage to lunar CubeSat missions utilizing three to four of the NENs mid-latitude sites. This coverage would supplement coverage provided by the JPL Deep Space Network (DSN). The NEN, with smaller apertures than DSN, provides the benefit of a larger beamwidth that could be beneficial in the event of uncertain ephemeris data. In order to realize these benefits the NEN would need to upgrade stations targeted based on coverage ability and current configuration/ease of upgrade, to ensure compatibility with the IRIS radio. In addition, the NEN is working with CubeSat radio developers to ensure NEN compatibility with alternative CubeSat radios for Lunar and L1/L2 CubeSats. The NEN has provided NEN compatibility requirements to several radio developers who are developing radios that offer lower cost and, in some cases, more capabilities with fewer constraints. The NEN is ready to begin supporting CubeSat missions. The NEN is considering network upgrades to broaden the types of CubeSat missions that can be supported and is supporting both the CubeSat community and radio developers to ensure future CubeSat missions have multiple options when choosing a network for their communications support.

Schaire, Scott↗

NASA Integrated Network Monitor and Control Software Architecture

The National Aeronautics and Space Administration (NASA) Space Communications and Navigation office (SCaN) has commissioned a series of trade studies to define a new architecture intended to integrate the three existing networks that it operates, the Deep Space Network (DSN), Space Network (SN), and Near Earth Network (NEN), into one integrated network that offers users a set of common, standardized, services and interfaces. The integrated monitor and control architecture utilizes common software and common operator interfaces that can be deployed at all three network elements. This software uses state-of-the-art concepts such as a pool of re-programmable equipment that acts like a configurable software radio, distributed hierarchical control, and centralized management of the whole SCaN integrated network. For this trade space study a model-based approach using SysML was adopted to describe and analyze several possible options for the integrated network monitor and control architecture. This model was used to refine the design and to drive the costing of the four different software options. This trade study modeled the three existing self standing network elements at point of departure, and then described how to integrate them using variations of new and existing monitor and control system components for the different proposed deployments under consideration. This paper will describe the trade space explored, the selected system architecture, the modeling and trade study methods, and some observations on useful approaches to implementing such model based trade space representation and analysis.

Next Generation Uplink↗

Method for providing concentricity of pilot fuel assembly in a combustor

Concentric installation of a pilot fuel assembly in an opening in a gas turbine combustor casing is achieved by providing a boss having at least two flat surfaces which are perpendicular to each other on the combustor casing surrounding the opening and a mounting flange having at least two flat surfaces which are perpendicular to each other on the pilot fuel assembly. The pilot fuel assembly is concentrically installed to the combustor casing by inserting the assembly into the combustor casing opening, and moving the pilot fuel assembly as far as it will go in a first direction substantially parallel to one of the flat boss surfaces. The distance between the other flat boss surface and one of the flat flange surfaces is then taken. Next, the pilot fuel assembly is moved in the direction opposite the first direction, at which point, the distance between the same two flat surfaces is again measured. Lastly, the pilot fuel assembly is located at a position where the distance between the two measuring surfaces is equal to the average of the first and second measurements. If desired, these steps can be repeated back and forth along an axis perpendicular to the first and second directions.

Halila, Ely E.↗