Engineering PapersSearch

Engineering topics

Allee, E. G.

Publications and source records attributed to Allee, E. G..

COMET Progresses Toward First Mission

The COMmercial Experiment Transporter (COMET) is a set of hardware and related infrastructure used to support orbital experiments of the CDD's and their industrial partners. During this year major support contracts were signed, preliminary design reviews conducted, experiments selected for the first mission, and long lead items place on order. The Program Office and CCDS Monitors took an active role in guiding COMET through the activation maze. Launch and recovery sites were selected and licenses for the launch vehicle, recovery system, and recovery operations were filed by the contractors with the Department of Transportation. As the period closed, COMET was preparing for Critical Design Reviews on all major systems and a target launch data was selected. This report deals primarily with the programmatic issues which were resolved as the program matured. At times is is impossible to disassociate the technical from the programmatic and, in such cases the technical material is presented to provide insight into the paths selected by both CCDS and Contractor Management.

Pawlick, J.

COMET: First mission progress

The COMmercial Experiment Transporter (COMET) is a set of hardware and related infrastructure used to support orbital experiments of the Commerical Centers for the Development of Space (CCDS's) and their industrial partners. During the three years since the program started, contracts have been signed, design reviews conducted on all components, experiments selected for the first mission, all hardware has been manufactured, the first phase of integrated testing of the satellite, the experiments, and the Launch Facility have all been completed. The program experienced several delays in 1993. A component failure in the Service Module during preparation for environmental testing in January resulted in an eight-week delay for the Service Module part of the FreeFlyer. Discovery of large overruns of the mass budget required a major revision of the mission profile for COMET 1. In the spring of 1993, Space Industries Incorporated (SII) and Westinghouse stopped work because of a lack of funds. EER continued to work toward completion of their launch systems. SII and Westinghouse resumed work in September 1993. Since resumption of work, a technical review of all systems to ascertain their state of readiness has been completed. No major problems were discovered. All systems are proceeding toward a launch date in the first quarter of 1994.

Pawlick, Joseph F., Jr.