Engineering Papers⌕ Search

Engineering topics

Alexander, Stephen W.

Publications and source records attributed to Alexander, Stephen W..

Fast Track Lunar NTR Systems Assessment for NASA's First Lunar Outpost and Its Evolvability to Mars

Integrated systems and missions studies are presented for an evolutionary lunar-to-Mars space transportation system (STS) based on nuclear thermal rocket (NTR) technology. A 'standardized' set of engine and stage components are identified and used in a 'building block' fashion to configure a variety of piloted and cargo, lunar and Mars vehicles. The reference NTR characteristics include a thrust of 50 thousand pounds force (klbf), specific impulse (I(sub sp)) of 900 seconds, and an engine thrust-to-weight ratio of 4. 3. For the National Aeronautics and Space Administrations (NASA) First Lunar Outpost (FLO) mission, and expendable NTR stage powered by two such engines can deliver approximately 96 metric tonnes (t) to trans-lunar injection (TLI) conditions for an initial mass in low Earth orbit (IMLEO) of approximately 198 t compared to 250 t for a cryogenic chemical system. The stage liquid hydrogen (LH2) tank has a diameter, length, and capacity of 10 m, 14.5 m and 66 t, respectively. By extending the stage length and LH2 capacity to approximately 20 m and 96 t, a single launch Mars cargo vehicle could deliver to an elliptical Mars parking orbit a 63 t Mars excursion vehicle (MEV) with a 45 t surface payload. Three 50 klbf engines and the two standardized LH2 tanks developed for the lunar and Mars cargo vehicles are used to configure the vehicles supporting piloted Mars missions as early as 2010. The 'modular' NTR vehicle approach forms the basis for an efficient STS able to handle the needs of a wide spectrum of lunar and Mars missions.

Borowski, Stanley K.↗

Fast Track NTR Systems Assessment for NASA's First Lunar Outpost Scenario

Integrated systems and mission study results are presented which quantify the rationale and benefits for developing and using nuclear thermal rocket (NTR) technology for returning humans to the moon in the early 2000's. At present, the Exploration Program Office (ExPO) is considering chemical propulsion for its 'First Lunar Outpost' (FLO) mission, and NTR propulsion for the more demanding Mars missions to follow. The use of an NTR-based lunar transfer stage, capable of evolving to Mars mission applications, could result in an accelerated schedule, reduced cost approach to moon/Mars exploration. Lunar mission applications would also provide valuable operational experience and serve as a 'proving ground' for NTR engine and stage technologies. In terms of performance benefits, studies indicate that an expendable NTR stage powered by two 50 klbf engines can deliver approximately 96 metric tons (t) to trans-lunar injection (TLI) conditions for an initial mass in low earth orbit (IMLEO) of approximately 199 t compared to 250 t for a cryogenic chemical TLI stage. The NTR stage liquid hydrogen (LH2) tank has a 10 m diameter, 14.8 m length, and 68 t LH2 capacity. The NTR utilizes a 'graphite' fuel form consisting of coated UC2 particles in a graphite substrate, and has a specific impulse capability of approximately 870 s, and an engine thrust-to-weight ratio of approximately 4.8. The NTR stage and its piloted FLO lander has a total length of approximately 38 m and can be launched by a single Saturn V-derived heavy lift launch vehicle (HLLV) in the 200 to 250 t-class range. The paper summarizes NASA's First Lunar Outpost scenario, describes characteristics for representative engine/stage configurations, and examines the impact on engine selection and vehicle design resulting from a consideration of alternative NTR fuel forms and lunar mission profiles.

Borowski, Stanley K.↗

Mission and sizing analysis for the Beta II two-stage-to-orbit vehicle

NASA Lewis Research Center studied a horizontal takeoff and landing, fully reusable, two-stage-to-orbit (TSTO) vehicle capable of launching and returning a 10,000 pound payload to low earth orbit using low-risk technology. The vehicle, called Beta 2, was derived from the USAF/Boeing Beta vehicle, a TSTO study vehicle capable of launching a 50,000 pound payload to low earth orbit. Development of the Beta 2 from the USAF/Boeing Beta vehicle occurred in a series of iterations during which the size of the vehicle was decreased to accommodate the smaller payload, the staging Mach number was decreased from 8.0 to 6.5, and the rocket propulsion system was removed from the booster. The final Beta 2 vehicle consisted of a rocket powered orbiter and an all airbreathing booster. The gross takeoff weight of the Beta 2 vehicle was approximately 1.1 million pounds. In addition to its baseline mission, the Beta 2 was capable of delivering approximately 17,500 pounds to the Space Station with the same takeoff gross weight. The mission and sizing analysis performed to arrive at the Beta 2 vehicle is discussed.

Nadell, Shari-Beth↗

Mission and sizing analysis for the Beta 2 two-stage-to-orbit vehicle

NASA Lewis Research Center studied a horizontal takeoff and landing, fully reusable, two-stage-to-orbit (TSTO) vehicle capable of launching and returning a 10,000 pound payload to low Earth polar orbit using low-risk technology. The vehicle, called Beta 2, was derived from the USAF/Boeing Beta vehicle, a TSTO study vehicle capable of launching a 50,000 pound payload to low Earth polar orbit. Development of the Beta 2 from the USAF/Boeing Beta vehicle occurred in a series of iterations during which the size of the vehicle was decreased to accommodate the smaller payload, the staging Mach number was decreased from 8.0 to 6.5, and the rocket propulsion system was removed from the booster. The final Beta 2 vehicle consisted of a rocket powered orbiter and an all airbreathing booster. The gross takeoff weight of the Beta 2 vehicle was approximately 1.1 million pounds. In addition to its baseline mission, the Beta 2 was capable of delivering approximately 17,500 pounds to the Space Station with the same takeoff gross weight. The mission and sizing analysis performed to arrived at the Beta 2 vehicle is discussed.

Nadell, Shari-Beth↗

Fast track lunar NTR systems assessment for the First Lunar Outpost and its evolvability to Mars

The objectives of the 'fast track' lunar Nuclear Thermal Rocket (NTR) analysis are to quantify necessary engine/stage characteristics to perform NASA's 'First Lunar Outpost' scenario and to assess the potential for evolution to Mars mission applications. By developing NTR/stage technologies for use in NASA's 'First Lunar Outpost' scenario, NASA will make a major down payment on the key components needed for the follow-on Mars Space Transportation System. A faster, cheaper approach to overall lunar/Mars exploration is expected.

Borowski, Stanley K.↗

Minimum impulse trajectories for Mars round trip missions

Data are presented for minimum-impulse earth-Mars round-trip trajectories for the 2010 to 2027 Mars launch opportunities. Round-trip mission times from 120 to 600 days, including a 30-day rendezvous at Mars, for direct trajectories and trajectories utilizing a Venus gravitational assist are considered. Optimal planetary launch and arrival dates and total impulse requirements are based on all maneuvers being performed propulsively with no finite burn or other losses. Direct trajectories have the lowest impulse requirements for shorter mission times and Venus gravitational assist trajectories have the lowest impulse requirements for longer mission times. It is shown that one can depart on trajectories to Mars, beginning with lower energy trajectories to the moon. The fuel savings varies, depending on the final energy level required and on the swingby procedure used. Procedures discussed include single lunar swingbys, double-powered or unpowered lunar swingbys, third lunar flybys a year later, and gravity assists by Venus and earth after the final lunar swingby.

Horvat, Glen M.↗