Engineering Papers⌕ Search

Engineering topics

Alan Chichester Abeel

Publications and source records attributed to Alan Chichester Abeel.

An Overview of Contamination Control for the James Webb Space Telescope Launch Campaign

The James Webb Space Telescope (JWST) is a large, infrared space telescope operating at Lagrange point 2. JWST is a joint effort between NASA, ESA, and CSA and was launched from the Centre Spatial Guyanais (CSG) on an Ariane 5 rocket in December 2021. The three-month launch campaign utilized enhanced contamination controls to meet JWST’s strict cleanliness requirements. Prior to launch, JWST was permitted to only be exposed to ISO Class 7 cleanrooms, whereas the processing facilities at CSG are ISO Class 8. NASA, ESA, Arianespace, and CNES implemented temporary upgrades to the nominal contamination control operations for the launch campaign unique to JWST, including the use of vetted, portable High Efficiency Particulate Air (HEPA) filter walls, pre-entrance cleanliness acceptance surveys of each facility and the intra-plant transporter, tightened cleanroom protocols, upgraded garmenting and laundering techniques, cleaning of Self-Contained Atmospheric Protection Ensemble (SCAPE) suits, increased maintenance, staffed pre-cleaning stations, adaptation of the house purge network, and a contamination control enclosure atop the Ariane 5 launcher prior to fairing encapsulation. The Ariane 5 fairing interior and Vehicle Equipment Bay membrane also received multiple cleanings, detailed inspections, and verification sampling to achieve necessary cleanliness levels. The fairing itself was specially sealed to protect the inner environment with just a small, door porthole accessible via diving board for final closeout of the purge interface. All of these enhancements together allowed JWST to meet its contamination requirements for launch, ensuring successful post-separation deployments and mission science.

Contamination Control↗

Clean Air Shower Curtain for Protection of Contamination Sensitive Telescopes on the Ariane 5 Launcher

The launch of the James Webb Space Telescope (JWST) was successfully performed by Ariane 5 from French Guiana on December 25th 2021. The unique nature of the JWST mission led to various adaptations of the Ariane 5 launch system to fulfill stringent cleanliness and hygrometry requirements all along the launch preparation. JWST integration and test activities in the Final Assembly Building (BAF) had to be performed in ISO Class 7 equivalent conditions under Volatile Organic Compounds (VOC) protection and monitoring. For this purpose, a dedicated air supply system equipped with Airborne Molecular Contamination (AMC) filters was installed in the umbilical mast. The fairing itself was specially sealed to protect the inner environment, and to, guarantee ISO Class 7, the BAF Composite Hall (BAF-HC) facilities were upgraded with a removable “Air Shower Curtain” (AShC) containment enclosure between the mobile platforms around JWST. The preparation of these Ariane 5 launch system adaptations started several years before the launch campaign with close cooperation and coordination between Arianespace, ArianeGroup, the European Space Agency (ESA) and the National Aeronautics and Space Administration (NASA). This paper describes their specificities and addresses the challenges experienced to achieve the successful mission preparation.

Contamination Control, James Webb Space Telescope,↗