Engineering PapersSearch

Engineering topics

Akar, Sertac

Publications and source records attributed to Akar, Sertac.

SolarAPP+ Performance Review: Final Technical Report

The National Renewable Energy Laboratory (NREL) and its project partners have developed the novel Solar Automated Permit Processing plus (SolarAPP+) software platform that provides a flexible, web-based PV-permitting tool for residential systems that can be integrated with existing and complementary software platforms. The main objective of this research is to analyze the implementation of SolarAPP+. Analysis was conducted by identifying the benefits, tradeoffs, and overall performance of SolarAPP+, including achieving its goals of delivering automated, code compliant systems, influencing permitting cycle times, and improving application submittals and/or inspection performance. The NREL team published the results of this analysis in annual SolarAPP+ Performance Review technical reports.

29 ENERGY PLANNING, POLICY, AND ECONOMY

RePED 250: A Revolutionary, High Drilling Rate, High-T Geothermal Drilling System and Companion Power Electronics (Final Report)

Geothermal drilling in the United States is drastically slower and more costly than Oil and Gas drilling, primarily due to the additional challenges in geothermal wells: hard rock types and high temperatures. The Repetitive Pulsed Electric Drill (250 degrees C) (RePED-250), developed by Tetra Corporation has the potential to change this with a novel electro-crushing technology. RePED-250 releases pulses of electricity through the rock, which causes it to break in tension, instead of compression like conventional rotary drilling. The tensile strength of hard rocks like granite is only ~5% of their compressive strength, requiring less energy, time, and wear on the bit than conventional drilling. The RePED drill bit has no moving parts, uses drilling mud to remove rock fragments, and standard drill pipe, enabling a direct transition from conventional drilling systems. The objective of this project is to move RePED technology towards commercial readiness for high-temperature geothermal applications. This involves: 1) Creating high-temperature, high power electronic components for the RePED drill capable of operating at the high temperatures of a geothermal well. The target is a 250 degrees C ambient environment. Specifically, capacitors, high voltage switches, and a downhole generator capable of generating the necessary power. 2) Demonstrating RePED's effectiveness drilling through hard rock (granite) and examining its pathway to commercialization and effect on the US geothermal market. Work on this project has led to significant improvement over the state-of-the-art for all the examined electronics, through design, modeling, and testing of these novel components, though some additional development is still needed to deploy these high-temperature parts in a geothermal well. Besides their use in RePED-250, each component has applications in other industries where the stability of electronics at high-temperature is needed. To address the second barrier to commercialization, a 9" hole was drilled through a sample block of granite, demonstrating the tool's effectiveness in hard rock. The team investigated RePED-250's effect on well cost, and the geothermal industry, through various models described in the report.

15 GEOTHERMAL ENERGY

SolarAPP+ Performance Review (2023 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) and battery storage permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have that information automatically reviewed for code compliance, and receive instant approval for code-compliant systems, reducing authority having jurisdiction (AHJ) staff time needed for review. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. SolarAPP+ is available to AHJs at no cost. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through traditional AHJ permitting processes. As of the end of 2023, the National Renewable Energy Laboratory (NREL) had contacted over 1,700 AHJs with significant solar permitting volume regarding SolarAPP+. Of those, 793 AHJs had expressed interest in the platform as of the end of 2023. 161 AHJs had begun piloting the platform and 97 of these had publicly launched the platform by the end of 2023. In 2023, 668 installers submitted 18,906 permits through the SolarAPP+ platform, including 4,834 permits submitted as part of a solar plus storage program. SolarAPP+ permits accounted for around 43% of all permits issued in participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 14.5 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved around 7,200 hours of AHJ staff time in 2023. Finally, we estimate that SolarAPP+ eliminated over 150,000 business days in permitting-related delays in 2023.

14 SOLAR ENERGY