Engineering Papers⌕ Search

Engineering topics

Agram, J.-L.

Publications and source records attributed to Agram, J.-L..

Beam test performance studies of CMS Phase-2 Outer Tracker module prototypes

A new tracking detector will be installed as part of thePhase-2 upgrade of the CMS detector for the high-luminosity LHC era.This tracking detector includes the Inner Tracker, equipped withsilicon pixel sensor modules, and the Outer Tracker, consisting ofmodules with two parallel stacked silicon sensors. The Outer Trackerfront-end ASICs will be able to correlate hits from chargedparticles in these two sensors to perform on-module discriminationof transverse momenta (p$_{T}$). The p$_{T}$information is generated at a frequency of 40 MHz and will be usedin the Level-1 trigger decision of CMS. Prototypes of theso-called 2S modules were tested at the Test Beam Facility at DESYHamburg between 2019 and 2020. These modules use the finalfront-end ASIC, the CMS Binary Chip (CBC), and for the firsttime the Concentrator Integrated Circuit (CIC), optical readoutand on-module power conversion. In total, seven modules were tested,one of which was assembled with sensors irradiated with protons. Animportant aspect was to show that it is possible to read out modulessynchronously. A cluster hit efficiency of about 99.75 % wasachieved for all modules. The CBC p$_{T}$ discriminationmechanism has been verified to work together with the CIC andoptical readout. The measured module performance meets therequirements for operation in the upgraded CMS tracking detector.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Measurement of the fractional radiation length of a pixel module for the CMS Phase-2 upgrade via the multiple scattering of positrons

High-luminosity particle collider experiments such as theones planned at the High-Luminosity Large Hadron Collider requireever-greater vertexing precision of the tracking detectors,necessitating reductions in the material budget of the detectors.Traditionally, the fractional radiation length (x/X$_{0}$) ofdetectors is either estimated using known properties of theconstituent materials, or measured in dedicated runs of the finaldetector. In this paper, we present a method of direct measurementof the material budget of a CMS prototype module designed for thePhase-2 upgrade of the CMS detector using a 40–65 MeV positronbeam. A total of 630 million events were collected at the PaulScherrer Institut PiE1 experimental area using a three-planetelescope consisting of the prototype module as the central plane,surrounded by two MALTA monolithic pixel detectors. Fractionalradiation lengths were extracted from scattering angle distributionsusing the Highland approximation for multiple scattering. Astatistical technique recovered runs suffering from triggerdesynchronisation, and several corrections were introduced tocompensate for local inefficiencies related to geometric and beamshape constraints. Two regions of the module were surveyed andyielded average x/X$_{0}$ values of (0.72 ± 0.05)% and(0.95 ± 0.09)%, which are compatible with empirical estimatesfor these regions computed from known material properties of 0.753%and 0.892%, respectively. Two types of higher-granularity maps ofthe fractional radiation length were produced, subdivided eitherinto rectangular regions of uniform size, or polygonal-shapedregions of uniform material composition. The results bode well forthe CMS Phase-2 upgrade modules, which will play a key role in theminimisation of the material of the upgraded detector.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Evaluation of planar silicon pixel sensors with the RD53A readout chip for the Phase-2 Upgrade of the CMS Inner Tracker

The Large Hadron Collider at CERN will undergo an upgrade inorder to increase its luminosity to7.5 × 10$^{34}$ cm$^{-2}$s$^{-1}$. The increased luminosityduring this High-Luminosity running phase, starting around 2029,means a higher rate of proton-proton interactions, hence a largerionizing dose and particle fluence for the detectors. The currenttracking system of the CMS experiment will be fully replaced inorder to cope with the new operating conditions. Prototype planarpixel sensors for the CMS Inner Tracker with square50 μm × 50 μm and rectangular100 μm × 25 μm pixels read out by theRD53A chip were characterized in the lab and at the DESY-II testbeamfacility in order to identify designs that meet the requirements ofCMS during the High-Luminosity running phase. A spatial resolutionof approximately 3.4 μm (2 μm) is obtained using themodules with 50 μm × 50 μm(100 μm × 25 μm) pixels at the optimalangle of incidence before irradiation. After irradiation to a 1 MeVneutron equivalent fluence ofΦ$_{eq}$ = 5.3 × 10$^{15}$ cm$^{-2}$, a resolution of9.4 μm is achieved at a bias voltage of 800 V using a modulewith 50 μm × 50 μm pixel size. All modulesretain a hit efficiency in excess of 99% after irradiation tofluences up to 2.1 × 10$^{16}$ cm$^{-2}$. Further studies ofthe electrical properties of the modules, especially crosstalk, arealso presented in this paper.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Evaluation of HPK n + - p planar pixel sensors for the CMS Phase-2 upgrade

To cope with the challenging environment of the planned high luminosity upgrade of the Large Hadron Collider (HL-LHC), scheduled to start operation in 2029, CMS will replace its entire tracking system. The requirements for the tracker are largely determined by the long operation time of 10 years with an instantaneous peak luminosity of up to 7.5 × 10 34 cm –2 s –1 in the ultimate performance scenario. Depending on the radial distance from the interaction point, the silicon sensors will receive a particle fluence corresponding to a non-ionizing energy loss of up to $\Phi_{\text {eq}}$ = 3.5 × 10 16 cm –2 . Here this paper focuses on planar pixel sensor design and qualification up to a fluence of $\Phi_{\text {eq}}$ = 1.4 × 10 16 cm –2 . For the development of appropriate planar pixel sensors an R&D program was initiated, which includes $n^+ -p$ sensors on 150 mm (6”) wafers with an active thickness of 150 μm with pixel sizes of 100 × 25 μm 2 and 50 × 50 μm 2 manufactured by Hamamatsu. Single chip modules with ROC4Sens and RD53A readout chips were made. Irradiation with protons and neutrons, as well was an extensive test beam campaign at DESY were carried out. This paper presents the investigation of various assemblies mainly with ROC4Sens readout chips. It demonstrates that multiple designs fulfill the requirements in terms of breakdown voltage, leakage current and efficiency. The single point resolution for 50 × 50 μm 2 pixels is measured as 4.0 μm for non-irradiated samples, and 6.3 μm after irradiation to $\Phi_{\text {eq}}$ = 7.2 × 10 15 cm –2 .

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The CMS Phase-1 Pixel Detector Upgrade

The CMS detector at the CERN LHC features a silicon pixel detector as its innermost subdetector. The original CMS pixel detector has been replaced with an upgraded pixel system (CMS Phase-1 pixel detector) in the extended year-end technical stop of the LHC in 2016/2017. The upgraded CMS pixel detector is designed to cope with the higher instantaneous luminosities that have been achieved by the LHC after the upgrades to the accelerator during the first long shutdown in 2013–2014. Compared to the original pixel detector, the upgraded detector has a better tracking performance and lower mass with four barrel layers and three endcap disks on each side to provide hit coverage up to an absolute value of pseudorapidity of 2.5. This paper describes the design and construction of the CMS Phase-1 pixel detector as well as its performance from commissioning to early operation in collision data-taking.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Alignment of the CMS Silicon Strip Tracker during stand-alone Commissioning

The results of the CMS tracker alignment analysis are presented using the data from cosmic tracks, optical survey information, and the laser alignment system at the Tracker Integration Facility at CERN. During several months of operation in the spring and summer of 2007, about five million cosmic track events were collected with a partially active CMS Tracker. This allowed us to perform first alignment of the active silicon modules with the cosmic tracks using three different statistical approaches/ validate the survey and laser alignment system performance/ and test the stability of Tracker structures under various stresses and temperatures ranging from +15C to -15C. Comparison with simulation shows that the achieved alignment precision in the barrel part of the tracker leads to residual distributions similar to those obtained with a random misalignment of 50 (80) microns in the outer (inner) part of the barrel.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Performance studies of the CMS Strip Tracker before installation

In March 2007 the assembly of the Silicon Strip Tracker was completed at the Tracker Integration Facility at CERN. Nearly 15% of the detector was instrumented using cables, fiber optics, power supplies, and electronics intended for the operation at the LHC. A local chiller was used to circulate the coolant for low temperature operation. In order to understand the efficiency and alignment of the strip tracker modules, a cosmic ray trigger was implemented. From March through July 4.5 million triggers were recorded. This period, referred to as the Sector Test, provided practical experience with the operation of the Tracker, especially safety, data acquisition, power, and cooling systems. This paper describes the performance of the strip system during the Sector Test, which consisted of five distinct periods defined by the coolant temperature. Significant emphasis is placed on comparisons between the data and results from Monte Carlo studies.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗