Engineering PapersSearch

Engineering topics

Adler, M.

Publications and source records attributed to Adler, M..

At least 19 records

Flexible-Path Human Exploration

In the fourth quarter of 2009 an in-house, multi-center NASA study team briefly examined "Flexible Path" concepts to begin understanding characteristics, content, and roles of potential missions consistent with the strategy proposed by the Augustine Committee. We present an overview of the study findings. Three illustrative human/robotic mission concepts not requiring planet surface operations are described: assembly of very large in-space telescopes in cis-lunar space; exploration of near Earth objects (NEOs); exploration of Mars' moon Phobos. For each, a representative mission is described, technology and science objectives are outlined, and a basic mission operations concept is quantified. A fourth type of mission, using the lunar surface as preparation for Mars, is also described. Each mission's "capability legacy" is summarized. All four illustrative missions could achieve NASA's stated human space exploration objectives and advance human space flight toward Mars surface exploration. Telescope assembly missions would require the fewest new system developments. NEO missions would offer a wide range of deep-space trip times between several months and two years. Phobos exploration would retire several Marsclass risks, leaving another large remainder set (associated with entry, descent, surface operations, and ascent) for retirement by subsequent missions. And extended lunar surface operations would build confidence for Mars surface missions by addressing a complementary set of risks. Six enabling developments (robotic precursors, ISS exploration testbed, heavy-lift launch, deep-space-capable crew capsule, deep-space habitat, and reusable in-space propulsion stage) would apply across multiple program sequence options, and thus could be started even without committing to a specific mission sequence now. Flexible Path appears to be a viable strategy, with meaningful and worthy mission content.

Augustine

Mars Exploration Rover: Launch, Cruise, Entry, Descent, and Landing

The Mars Exploration Rover Project was an ambitious effort to land two highly capable rovers on Mars and concurrently explore the Martian surface for three months each. Launched in June and July of 2003, cruise operations were conducted through January 4, 2004 with the first landing, followed by the second landing on January 25. The prime mission for the second rover ended on April 27, 2004. This paper will provide an overview of the launch, cruise, and landing phases of the mission, including the engineering and science objectives and challenges involved in the selection and targeting of the landing sites, as well as the excitement and challenges of atmospheric entry, descent and landing execution.

Entry, Descent, Landing, (EDL)

Mars Exploration Rover Mission

Two rovers with a sophisticated geological payload have been operating on the surface of Mars since January of 2004. Future missions and their related technology developments will benefit from the lessons learned during these surface operations. The planning cycle was dictated by the communications opportunities and the times of day that the rovers could operate, and the team and tools were tuned to optimize the mission return for that cycle time. The ability to traverse and to approach and perform in situ investigations on targets was limited in speed by the same cycle time, due to required human involvement in the related planning and risk decisions. In addition traverse was limited by the speed of the on-board terrain and hazard assessment, and in situ operations were limited by a lack of autonomy. Different planning cycles and levels of autonomy should be considered for future surface missions, which will result in different approaches to science decision making.

Adler, M.

Selection of the Final Four Landing Sites for the Mars Exploration Rovers

Engineering constraints developed for the Mars Exploration Rovers (MER), their translation into ~185 potential landing sites and their downselection to 6 high priority science sites have been described [1, 2]. These 6 sites (Meridiani-previously referred to as Hematite, Gusev, Isidis, Melas, Eos, and Athabasca) were evaluated in detail as to their science potential and safety, relative to specific engineering constraints, at the 3rd MER Landing Site Workshop held March 26-28, 2002 in Pasadena, CA. This abstract describes: (1) the evaluation of these 6 sites, (2) the removal and reprioritization of sites following this workshop, (3) the identification of a low-wind site in Elysium, (4) the final 4 sites being considered for landing the 2 MER and (5) their evaluation at the 4th MER Landing Site Workshop held January 8-10, 2003 in Pasadena, CA [3].

Golombek, M.

Mars Exploration Rover: surface operations

This paper will provide an overview of the planned mission, and also focus on the different operations challenges inherent in operating these two very off road vehicles, and the solutions adopted to enable the best utilization of their capabilities for high science return and responsiveness to scientific discovery.

Mars rover EDL operations

Mars Sample Return Mission Scenario

NASA and CNES are about to embark on a bold, exciting, and pioneering joint scientific mission to bring to Earth selected samples of the planet Mars.

Mars Sample Return (MSR) robotic spacecraft lander