Engineering Papers⌕ Search

Engineering topics

Abraham, Douglas S.

Publications and source records attributed to Abraham, Douglas S..

34 records · Page 2

Architectural and Operational Considerations Emerging from Hybrid RF-Optical Network Loading Simulations

We have the technical capability to model hybrid deep-space RF and Optical communications networks, but we have little guidance on how the missions and ground architectures will be designed and operated. We exposed several issues that must be resolved before an optimal solution can be reached. With future studies, we may be able to determine solutions to these issues, and perform more precise loading performance analyses to arrive at the most optimal RF and optical ground assets combinations for meeting the projected future demand. The results will then help inform NASA as it plans for infrastructure development to prepare for human/robotic missions in the coming decades.

Chen, Yijiang↗

Deep Space Mission Trend Analyses: A Briefing to the Next Generation EBRE Study Team

Determination of stakeholder needs for next generation implementations necessitates a multi ]pronged approach. . Future mission set analyses provide a lower gbound h for some of these needs. . Earth ]based analogies provide an upper gbound h for some of these needs. . Interpreting the results requires being mindful of both the near ]term contextual factors and long ]term factors that are in play. . In the context of last year fs analyses, the current budget environment, the potential Pu ]238 shortage, and SMD fs gsingle 34m only h policy may, collectively, create a future deep space mission set that, from a capacity and end ]to ]end link difficulty standpoint, is no more challenging than it is today. . Nonetheless, data rates and volumes continue to increase, suggesting capability and spectrum challenges ahead. These results agree with the results from the Earthbased analogies. . Emerging developments such as smallsats and distributed spacecraft could significantly change the capacity and end ]to ]end link difficulty picture.

future mission analysis↗

Emergency Communications for NASA's Deep Space Missions

The ability to communicate with spacecraft during emergencies is a vital service that NASA's Deep Space Network (DSN) provides to all deep space missions. Emergency communications is characterized by low data rates(typically is approximately10 bps) with the spacecraft using either a low-gain antenna (LGA, including omnidirectional antennas) or,in some cases, a medium-gain antenna (MGA). Because of the use of LGAs/MGAs for emergency communications, the transmitted power requirements both on the spacecraft andon the ground are substantially greater than those required for normal operations on the high-gain antenna (HGA) despite the lower data rates. In this paper, we look at currentand future emergency communications capabilities available to NASA's deep-space missions and discuss their limitations in the context of emergency mode operations requirements.These discussions include the use of the DSN 70-m diameter antennas, the use of the 34-m diameter antennas either alone or arrayed both for the uplink (Earth-to-spacecraft) and the downlink (spacecraft-to-Earth), upgrades to the ground transmitters, and spacecraft power requirements both with unitygain (0 dB) LGAs and with antennas with directivity (>0 dB gain, either LGA or MGA, depending on the gain). Also discussed are the requirements for forward-error-correctingcodes for both the uplink and the downlink. In additional, we introduce a methodology for proper selection of a directionalLGA/MGA for emergency communications.

Shambayati, Shervin↗

DSN Antenna Array Architectures Based on Future NASA Mission Needs

A flexible method of parametric, full life-cycle cost analysis has been combined with data on NASA's future communication needs to estimate the required number and operational dates of new antennas for the Deep Space Network (DSN). The requirements were derived from a subset of missions in the Integrated Mission Set database of NASA's Space Communications Architecture Working Group. Assuming that no new antennas are 'constructed', the simulation shows that the DSN is unlikely to meet more than 20% of mission requirements by 2030. Minimum full life-cycle costs result when antennas in the diameter range, 18m-34m, are constructed. Architectures using a mixture of antenna diameters produce a slightly lower full life-cycle cost.

array↗

Future Mission Trends and their Implications for the Deep Space Network

This viewgraph presentation discusses the direction of future missions and it's significance to the Deep Space Network. The topics include: 1) The Deep Space Network (DSN); 2) Past Missions Driving DSN Evolution; 3) The Changing Mission Paradigm; 4) Assessing Future Mission Needs; 5) Link Support Trends; 6) Downlink Rate Trends; 7) Uplink Rate Trends; 8) End-to-End Link Difficulty Trends; 9) Summary: Future Mission Trend Drivers; and 10) Conclusion: Implications for the DSN.

mission trends↗

Future Mission Trends and their Implications for the Deep Space Network

Planning for the upgrade and/or replacement of Deep Space Network (DSN) assets that typically operate for forty or more years necessitates understanding potential customer needs as far into the future as possible. This paper describes the methodology Deep Space Network (DSN) planners use to develop this understanding, some key future mission trends that have emerged from application of this methodology, and the implications of the trends for the DSN's future evolution. For NASA's current plans out to 2030, these trends suggest the need to accommodate: three times as many communication links, downlink rates two orders of magnitude greater than today's, uplink rates some four orders of magnitude greater, and end-to-end link difficulties two-to-three orders of magnitude greater. To meet these challenges, both DSN capacity and capability will need to increase.

future mission needs↗

The JPL roadmap for Deep Space navigation

This paper reviews the tentative set of deep space missions that will be supported by NASA's Deep Space Mission System in the next twenty-five years, and extracts the driving set of navigation capabilities that these missions will require. There will be many challenges including the support of new mission navigation approaches such as formation flying and rendezvous in deep space, low-energy and low-thrust orbit transfers, precise landing and ascent vehicles, and autonomous navigation. Innovative strategies and approaches will be needed to develop and field advanced navigation capabilities.

navigation↗

Architectural prospects for lunar mission support

A top-level architectural approach facilitates the provision of communications and navigation support services to the anticipated lunar mission set. Following the time-honored principles of systems architecting, i.e., form follows function, the first step is to define the functions or services to be provided, both in terms of character and degree. These will include communication as well as trackin and navigation services.

communications↗

Direct Communication to Earth from Probes

A viewgraph presentation on outer planetary probe communications to Earth is shown. The topics include: 1) Science Rational for Atmospheric Probes to the Outer Planets; 2) Controlling the Scientific Appetite; 3) Learning more about Jupiter before we send more probes; 4) Sample Microwave Scan From Juno; 5) Jupiter s Deep Interior; 6) The Square Kilometer Array (SKA): A Breakthrough for Radio Astronomy; 7) Deep Space Array-based Network (DSAN); 8) Probe Direct-to-Earth Data Rate Calculations; 9) Summary; and 10) Enabling Ideas.

Bolton, Scott J.↗

Deep Space C3 : high power uplinks

The uplink transmitters of the Deep Space Network (DSN) perform three key functions in support of space missions: navigation, command uplink, and emergency recovery. The transmitters range in frequency from S-band to Ka-band, and range in RF transmit power from 200W to 400kW. Future improvements to the uplink transmitters will focus on higher frequency transmitters for high data rate communications, high power X-band uplinks for emergency recovery, and /or in-phase uplink arraying for either application

Morabito, David D.↗

A Demonstration Plan For Lalser-Beamed Power

In a constrained budgetary era under pressure to develop faster, better, and less expensive space projects, efforts to develop laser-beamed power for lunar and propulsion applications must first focus on defining near-term, commercially attractive deliverables that will demonstrate progress toward, and engender support for development of an operational laser-beamed earth-orbital propulsion/lunar power system.

Laser-Beamed Power↗

Exploration of Pluto

Two NASA-sponsored cost-constrained mission implementations for the exploration of Pluto are described. One is the Pluto Fast Flyby (PFF) mission, which utilizes an 83 kg spacecraft to be launched in 1998 aboard a Titan IV (Solid Rocket Motor Upgrade)/Centaur) for an about 7-year-long direct trajectory to Pluto, which will carry an integrated CCD-imaging/UV spectrometer, with a possible integrated IR spectrometer. The other is the Pluto-350 spacecraft, weighing about 316 kg, which will carry a broader instrument set, greater redundancy, and which will require greater than 11 year flight time. Pluto-350 will be launched in 2001 aboard a Delta or Atlas, toward earth and Jupiter swingbys to provide the energy to reach Pluto.

Staehle, Robert L.↗